Cost
 
2.
2.
Existing Conditions
83,500
2.
31.
Earthwork
321,000
2.
32.
Exterior Improvements
796,800
2.
33.
Utilities
412,500
TOTAL
18,222,400
Architectural/Engineering Fees
2,977,600
TOTAL BUILDING COST
21,200,000

» Architecture »

System Information

 
PSU AE Senior Thesis Home
The Pennsylvania State Univeristy
Architectural Engineering Department
PSU AE Computer Lab
Resume

 
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Amanda Cronauer. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design